Tippen Gymnasium

PROJECT DESCRIPTION

The Tippin building renovations include new basketball courts and seating, two new concession areas, new natatorium with a combination swimming/diving pool, expanded wrestling space, locker rooms, and office space for the coaches. Additions attached to either side of the Tippin building include a new auxiliary gym, new weight room/fitness area, and additional locker rooms and coaches’ offices. The renovations also serve to enhance the presence of the building and the health and wellness programs on campus. The result is a state-of-the-art facility which is a hub for on-campus fitness and recreation and a recruitment tool to attract future students and student-athletes to the University.

PROJECT DETAILS

OWNER / DEVELOPER

Clarion University + DGS

CONTRACTOR

Mascaro Construction

ARCHITECT

DLA+GUND Partnership

COMPLETION

September 2019

SERVICES PERFORMED

  • Metal Stud Framing
  • Sound Absorbing Panels
  • Acoustic Ceilings
  • Wood Ceilings
  • Metal Soffit Panels
  • Drywall and Finishes
  • Finish Carpentry and Millwork
  • Doors, Frames + Hardware
  • Specialties

Providence Point

PROJECT DESCRIPTION

The Providence Point Hamilton Tower is a five-story 70-room luxury senior living facility including an indoor swimming pool, meeting rooms, cocktail lounge, bank, chapel, library, card room, billiards, movie theatre, wood working shop, day spa, and dining. JLJI provided delegated design, fabrication, and erection of the load-bearing cold form frame wall systems as well as all other interior finish systems.

PROJECT DETAILS

OWNER / DEVELOPER

Providence Point

CONTRACTOR

P.J. Dick Construction

ARCHITECT

RLPS Architects

COMPLETION

2019

SERVICES PERFORMED

  • Prefabricated Load Bearing Wall Panels
  • Exterior Cold Form Framing
  • Sheathing + Air Vapor Barriers
  • Metal Stud Framing
  • Sound Absorbing Insulation
  • Specialty Ceilings
  • Drywall and Finishes

The Gardens at Market Square

PROJECT DESCRIPTION

The Gardens at Market Square is an 18-story mixed-use office building, parking garage, and first floor retail space and an 11-story Hilton Garden Inn Hotel.

PROJECT DETAILS

OWNER / DEVELOPER

Millcraft Development

CONTRACTOR

Turner

ARCHITECT

Arquitectonica

COMPLETION

2015

SERVICES PERFORMED

  • Prefabricated Load Bearing Wall Panels
  • Exterior Cold Form Framing
  • Sheathing + Air Vapor Barriers
  • Metal Stud Framing
  • Sound Absorbing Insulation
  • Specialty Ceilings
  • Drywall and Finishes

Mill 19 at Hazelwood Green and Mill 19A – CMU Arm

PROJECT DESCRIPTION

The first of three buildings, at 90,000 square feet, this building is located in the heart of an abandoned steel mill structure. Work consisted of new ground-up construction, interior fit-out, and high detailed specialty finishes.

PROJECT DETAILS

OWNER / DEVELOPER

  • Core and Shell - RIDC
  • Tenant Fit Out - CMU ARM “Advanced Robotics for Manufacturing”

CONTRACTOR

  • Core and Shell - Turner Construction
  • CMU ARM TI – Jendoco Construction Corp

COMPLETION

September 2019

SERVICES PERFORMED

  • Metal Stud Framing
  • Sound Absorbing Plaster
  • Serpentine Soffits
  • Wood Ceilings
  • Sound Floors
  • Acoustic Ceilings
  • Drywall and Finishes
  • Spray Applied Acoustic Insulation
  • Wood Paneling

AC Marriot

PROJECT DESCRIPTION

The AC Marriot is a seven-story 133-room boutique hotel with lobby, meeting rooms, bar and restaurant, and other amenity spaces located on the seventh floor. JLJI provided delegated design, fabrication, and erection of the load-bearing cold form frame wall systems as well as all other interior finish systems

PROJECT DETAILS

OWNER / DEVELOPER

Concord Hospitality

CONTRACTOR

Turner

ARCHITECT

Myers + Associates

COMPLETION

2018

SERVICES PERFORMED

  • Prefabricated Load Bearing Wall Panels
  • Exterior Cold Form Framing
  • Sheathing + Air Vapor Barriers
  • Metal Stud Framing
  • Sound Absorbing Insulation
  • Specialty Ceilings
  • Drywall and Finishes
  • Nichiha Rain Screen Cladding